88kW company photovoltaic system connected to the LV grid
88kW corporate photovoltaic system installed in Sezze (Latina), connected to the LV grid.
The system consists of a 50kW inverter and a 40kW inverter, and field panels including DC surge arresters.
The interface panel was constructed with a dedicated SPI control unit, including relay box testing and CEI 0-21 certification, including the interface device (DDI) and backup device (DDR).
Installation of photovoltaic modules on the roof using a dedicated structure.
